North Melbourne Locomotive Depot Signalling Diagram

Gibbed's Dragon Age Save Generator - A generator that can create importable Dragon Age: Origins for Dragon Age 2 with user-specified options for plot, characters, etc. DA2 Import Fixes - This is a mod that changes the behaviour of Dragon Age 2 when determining various relationship flag states of an imported Dragon Age 1 savegame. It aims to ensure if a player was in a relationship with a party member in Dragon Age 1, the Dragon Age 2 plot flags in will properly reflect it. Dragon age origins mods reddit. I personally prefer mods that improve the look and function of the game without overstepping the intentions of the developers. This means mostly texture and bug fixing mods, and no custom items, stat changes, or lore-breaking mods. Hopefully this will help new players on the PC save some time. EDIT1: Forgot to include my preferred respec mod. The first mod I want to shout out is The Shattered War by AmstradHero (who more famously made the Alley of Murders mod). The campaign sees you playing as a new protagonist, a captain of a militia tasked with clearing up the remaining darkspawn after the 5th Blight. The mod is maybe 2-3 hours long, and it is a little tricky to find your way sometimes. Apply a large-address-aware patch like this to enable the game to use more memory. Qwinn's fixpack for general fixes, improvements and restorations. The rules fixpack for combat related fixes. Fixes for the Awakening expansion, regarding importing items and other things. Dragon Age Redesigned, so that every npc and their grandma and their dog will look a hundred times better.

HOME‎ > ‎

Macaulay Light Repair Centre

Train Maintenance Panel
Macaulay Light Repair Centre
Macaulay Stabling Sidings
Shunting via the Shunting Neck
Preparations Required

The Macaulay Stabling Sidings and the Macaulay Light Repair Centre can only be accessed via the Down Upfield Line.
MSS consists of 6 stabling sidings numbered 1 and 3 to 7 from the Upfield Down Line. The MLRC is located on 2 road. The Signaller Metrol operates the points to these sidings from the Main Line. The security gates are interlocked with signals. If gates fail, the Field Operations Manager or SMT will operate them under the direction of Metrol.
A notice board is erected near the first set of Hand Operated Points prior to entering Roads 3 to 7. This board states:
DRIVERS MUST NOT PASS THIS POINT WITHOUT FIRST ENSURING THAT THE POINTS ARE SET FOR A VACANT ROAD.

Roads 1 and 3 to 7 are capable of holding 1 six car train. Road 2 is capable of holding nine cars - three out, three in, three out.

When Melbourne's train network was first constructed the two central hubs, as now, were the Flinders Street and Spencer Street stations. Trains ran to and from theses stations to different parts of the city, and there was no direct link between the two of them, or the services that they provided.